Adding a primary bathroom to your house

Add a primary bathroom to a Simi Valley home, inside the footprint or as an addition. Why it needs City plan check, how long review takes, and what to prepare.

Licensed general building contractor since 2008: CSLB #925152, qualifier Paul V. Aguilar.

Primary bathroom with a long white oak double vanity and a curbless glass shower, golden hills through a high window, AI-generated illustration
Illustration of a primary bathroom remodel.
LicenceCSLB #925152Class B General Building, issued November 2008. Verify at CSLB
Service areaSimi ValleyMoorpark, Thousand Oaks and nearby
PermitsCity of Simi ValleyBuilding & Safety Division, not Ventura County

Plenty of Simi Valley houses from the 1960s and 1970s were built with one full bathroom in the hall and, at most, a half bath off the main bedroom. Adding a real primary bathroom is one of the projects that changes how a house lives day to day.

There are two ways to get the space: carve it out of rooms you already have, like a closet or part of a bedroom, or build onto the house. Either way it is new plumbing, new drains and usually new framing, so it goes through the City's full plan check rather than the quick remodel review.

Inside the footprint or an addition

Converting existing space is faster and avoids a new foundation and roof. It usually means giving up a closet, a small bedroom or part of the main bedroom, and moving or adding interior walls. Building onto the house keeps every room you have, but adds a foundation, an exterior wall and roofline, setbacks to respect and, in many Wood Ranch and Big Sky tracts, approval from the homeowners association before the City sees it.

  • Inside the footprint: shorter build, no exterior change, lose some closet or bedroom space
  • Addition: more space, longer review, foundation and roof work, possible HOA review
Clay tile rooftops of a Simi Valley neighborhood seen over a block wall from a back yard, golden hills and oaks beyond, AI-generated illustration
Illustration of Simi Valley rooftops and hills.

How a job runs

  1. Walk-through and written estimate

    We look at the space with you, measure, and put the scope and price in writing. The estimate is free.

  2. Contract and permit

    A written contract with the terms California law requires, and the City of Simi Valley permit when the work needs one.

  3. Build, inspect, walk through

    The inspections the permit calls for, a final walk-through with you, and payments that follow the work as it is done.

Hall bathroom on the day of the final walk-through, a wrapped mirror leaning on the wall and a folded drop cloth by the door, AI-generated illustration
Illustration of a bathroom at final inspection.

Why an addition takes longer at the City

The City's one-week review applies to bathroom remodels without a structural component. A new bathroom with new walls, a new opening or added square footage needs plans, and the City posts a separate timeline for projects that require plan review.

City of Simi Valley review steps for projects that need plan check
StagePosted time
Initial review by counter staffUp to 5 to 10 business days
Plan check after fees are paid20 to 25 working days, same for each resubmittal
Permit issued after the final invoice is paidUp to 3 business days
Shower walls and floor sealed with a green waterproof coating, the floor flooded with still water for a leak test before tile, AI-generated illustration
Illustration of a shower pan leak test.

Getting water in and waste out

A new bathroom has to drain downhill to the main line and vent through the roof. Where the new room sits relative to the existing drain decides much of the cost, and a slab foundation makes long drain runs harder than a raised floor does. We also look at whether the water heater can keep up with a second full shower in the house.

The City asks for one PDF of the full plan set when a project needs plan review, so drawings come first. We will tell you what the drawings need to show and help you line up the work before anything is submitted.

Bathroom addition at the rough-in stage with exposed studs, red and blue supply lines and white drain pipes ready for inspection, AI-generated illustration
Illustration of a bath addition at rough-in.

Questions homeowners ask

Do I need plans drawn for a new bathroom?

If the project needs plan review, yes. The City wants the full set as a single PDF with separate files for other construction documents. A bathroom built entirely inside existing space with no structural change may need less, which we can sort out at the estimate.

How long before work can start?

For an addition, the City's posted steps alone run from about five business days to more than a month, plus any resubmittals. Drawings and HOA approval, if your tract has one, come before that. Inside-the-footprint conversions are usually quicker.

My neighborhood has an HOA. Who handles that?

Approval from the association is the homeowner's request, but we provide the drawings and material details the architectural committee asks for. Plan on it before the City submittal for any change you can see from outside.

What does plan check cost?

It depends on the project's valuation. The City's FY 2024-25 schedule also lists an hourly plan check rate of $268.41 for extra review time, and fees are adjusted with inflation each year. We include the City's fees in the estimate as a separate line.

Sources

Facts on this page last verified: .

  1. City of Simi Valley Building and Safety, Online Permit Submittal Instructions: https://www.simivalley.org/departments/environmental-services/building-safety-division/online-permit-submittal-instructions (2026-10-05)
  2. City of Simi Valley Summary of Service Charges, effective July 1, 2024 (Building and Safety appendices): https://simivalleylibrary.org/wp-content/uploads/2025/02/CityofSimiValley_FeeSchedule2025.pdf (2026-10-05)
Bathroom tile, quartz and fixture trim samples laid out in rows on an oak table, AI-generated illustration
Illustration of tile and fixture choices.

A written estimate, free

We measure the space with you and put the scope and the price in writing. Under California law the down payment can never be more than $1,000 or 10 percent of the price, whichever is less.

Primary bathroom with a terracotta-tiled walk-in shower and bench, a walnut vanity and black fixtures, AI-generated illustration
Illustration of a walk-in shower with a bench.

Request a free estimate

How should we reach you?

We use what you send here to reply about this project, and, only if you ticked the email box, to send occasional tips by email. We do not sell or share it. Details in the privacy notice. Privacy.

No tracking cookies or analytics on this site. What you type here is stored only to answer your request.

Call

Monday to Saturday, 7am to 6pm

(818) 355-2301

Text: (818) 355-2301

(805) 864-2534

CSLB #925152 · B General Building Contractor