A full bathroom remodel, down to the studs

A full bathroom remodel opens the room to the studs: new drain and supply lines where needed, waterproofing, tile, vanity and lighting, on one City permit.

Licensed general building contractor since 2008: CSLB #925152, qualifier Paul V. Aguilar.

Hall bathroom with a white soaking tub, sage green tile to the ceiling and a painted single-sink vanity, AI-generated illustration
Illustration of a hall bath remodel with a tub.
LicenceCSLB #925152Class B General Building, issued November 2008. Verify at CSLB
Service areaSimi ValleyMoorpark, Thousand Oaks and nearby
PermitsCity of Simi ValleyBuilding & Safety Division, not Ventura County

A full remodel means everything comes out: tile, tub or shower, vanity, toilet, drywall and often the subfloor, until you are looking at framing and pipe. It is the right call when the problems are behind the tile, such as a slow drain, a soft spot by the toilet or water stains on the ceiling below.

Opening the room costs more up front than a surface refresh, but it is the only point where the drain, the supply lines, the wiring and the waterproofing can all be replaced together and inspected by the City before they are covered again.

What going down to the studs includes

The exact list depends on what we find once the walls are open, and the contract says how changes are handled if the drain turns out worse than expected. The usual scope looks like this:

  • Demolition and haul-away of tile, fixtures, drywall and damaged subfloor
  • Drain, vent and supply line changes inside the bathroom
  • New circuits for lighting and outlets, and a vented exhaust fan
  • Cement board or a waterproofing membrane behind every wet wall
  • Tile, vanity, toilet, shower valve and trim, glass, paint
Bathroom addition at the rough-in stage with exposed studs, red and blue supply lines and white drain pipes ready for inspection, AI-generated illustration
Illustration of a bath addition at rough-in.

How a job runs

  1. Walk-through and written estimate

    We look at the space with you, measure, and put the scope and price in writing. The estimate is free.

  2. Contract and permit

    A written contract with the terms California law requires, and the City of Simi Valley permit when the work needs one.

  3. Build, inspect, walk through

    The inspections the permit calls for, a final walk-through with you, and payments that follow the work as it is done.

Hall bathroom on the day of the final walk-through, a wrapped mirror leaning on the wall and a folded drop cloth by the door, AI-generated illustration
Illustration of a bathroom at final inspection.

Why older Simi Valley drains decide the scope

In the 1960s to 1980s houses around Texas Tract and Rancho Simi, the drain under the bathroom is frequently the original cast iron. Cast iron rusts from the inside, narrows, and eventually cracks along the bottom where you cannot see it. A bathroom full of new tile sitting on a failing drain is the most expensive mistake in this kind of remodel.

Before pricing a full remodel in an older home we look at how the drain behaves and, where it makes sense, recommend a camera inspection of the line. If it needs replacing, the cheapest time to do it is while the floor is already open, and it is covered under the same permit as the rest of the work.

Dated 1980s hall bathroom with an almond tub, beige tile, an oak vanity and worn caulk along the tub, AI-generated illustration
Illustration of a 1980s bathroom at the estimate.

Choices that set the schedule

Most delays on a full remodel come from decisions, not construction. A shower that waits on a tile order or a glass door that cannot be measured yet holds up everything behind it.

Fixture and finish choices and how they affect timing
ChoiceOptionsEffect on the work
Shower wallsTile, solid surface panels, acrylicTile adds setting and grout time; panels go up faster
Shower glassFramed, frameless, curtainFrameless glass is measured after tile, then made to order
VanityStock size, semi-custom, customCustom pieces add order time; stock sizes can be on site at demo
Shower valvePressure-balance, thermostaticMust be on site before rough plumbing inspection
FloorPorcelain tile, natural stone, vinyl plankStone needs sealing; vinyl is not for the shower floor
Bathroom tile, quartz and fixture trim samples laid out in rows on an oak table, AI-generated illustration
Illustration of tile and fixture choices.

Inspections you should expect

A permitted full remodel gets inspected while the walls are still open, so the inspector can see the pipe, the wiring and the shower waterproofing, and again at the end. The City's FY 2024-25 schedule lists a general inspection service charge of $75.78 per inspection on top of the $171.24 line for interior, non-structural renovation with plumbing, mechanical and electrical work. The City adjusts its fees with inflation, so expect the current figures to be somewhat higher.

Shower walls and floor sealed with a green waterproof coating, the floor flooded with still water for a leak test before tile, AI-generated illustration
Illustration of a shower pan leak test.

Questions homeowners ask

How long does a full bathroom remodel take?

Plan around two clocks. The City's review of a non-structural bathroom remodel takes up to one week. Construction time depends on what is behind the walls and how quickly finishes arrive, and your contract states approximate start and completion dates. Having tile, vanity and valve chosen before demolition is the biggest thing you control.

Can I buy my own tile and fixtures?

Yes. Tell us at the estimate so the contract separates labor from materials you supply. The one condition is timing: anything that goes inside the wall, like the shower valve, has to be on site before rough inspection.

Can the toilet or shower move to a different spot?

Usually, yes. Moving a fixture means moving its drain and vent, and that is easier over a raised floor with a crawlspace than over a concrete slab, where the concrete has to be cut and patched. We will tell you which kind of floor you have at the visit.

Do you replace the window or the door as part of the remodel?

We can, as part of the same general building permit. A window in a shower wall is a common source of rot in older homes, so we look at it during the estimate either way.

Sources

Facts on this page last verified: .

  1. City of Simi Valley Building and Safety, Online Permit Submittal Instructions: https://www.simivalley.org/departments/environmental-services/building-safety-division/online-permit-submittal-instructions (2026-10-05)
  2. City of Simi Valley Summary of Service Charges, effective July 1, 2024 (Building and Safety appendices): https://simivalleylibrary.org/wp-content/uploads/2025/02/CityofSimiValley_FeeSchedule2025.pdf (2026-10-05)
Curbless shower with wood-look plank tile running in from the bathroom floor to a slim linear drain along the back wall, AI-generated illustration
Illustration of a curbless shower drain detail.

A written estimate, free

We measure the space with you and put the scope and the price in writing. Under California law the down payment can never be more than $1,000 or 10 percent of the price, whichever is less.

Primary bathroom with a terracotta-tiled walk-in shower and bench, a walnut vanity and black fixtures, AI-generated illustration
Illustration of a walk-in shower with a bench.

Request a free estimate

How should we reach you?

We use what you send here to reply about this project, and, only if you ticked the email box, to send occasional tips by email. We do not sell or share it. Details in the privacy notice. Privacy.

No tracking cookies or analytics on this site. What you type here is stored only to answer your request.

Call

Monday to Saturday, 7am to 6pm

(818) 355-2301

Text: (818) 355-2301

(805) 864-2534

CSLB #925152 · B General Building Contractor